SHI | Integration Center 400 Ridge Road
A global provider of hardware and software integration expanded beyond their existing integration center and warehouse. An entire facility was constructed to be devoted to one service that SHI provides. The facility was designed with flexibility and reliability in mind. The electrical service is a medium voltage service and completely backed up by emergency generators. There are two 1,500 kW generators paralleled day-one, with plans for another two. There is a 1,200 ton water cooled chiller plant using water-cooled centrifugal chillers with room for a third chiller. All operations performed by SHI for their Clients is on UPS power and performed in tightly temperature controlled rooms.
-
400,000 square feet
$50,000,000 Construction Cost
-
HVAC
Electrical
Plumbing
Fire Protection
Structured Wiring